Real costs, verified installers, and personalised savings estimates for Ikeja, Lekki, Badagry, Epe, Ikorodu, Apapa and across Lagos.
Lagos receives an average of 4.9 peak sun hours per day — moderate solar irradiance that makes solar power a strong investment across the state. This is the number of hours each day when sunlight is intense enough to generate full-rated power from your panels.
In practical terms: a 4-panel, 1.6 kWp solar system in Ikeja will generate roughly 6.3 kWh of electricity daily — enough to run a refrigerator, ceiling fans, lights, and charge phones around the clock with battery storage.
Lagos receives relatively more grid electricity than many Nigerian states, but outages in Ikeja still run 8–16 hours daily for most residential areas. Solar remains essential for stable, predictable power.
Like most Nigerian states, Lagos struggles with inconsistent grid power. Residents of Ikeja and Lekki, Badagry, Epe, Ikorodu, Apapa face daily power cuts that force reliance on expensive petrol and diesel generators. After the fuel subsidy removal in 2023, the monthly cost of running a generator has risen sharply — many households now spend ₦60,000–₦150,000 per month on fuel and maintenance alone.
Solar eliminates this recurring cost. A well-sized hybrid system in Lagos runs on free sunlight during the day and stored battery power at night — silently, cleanly, and at a predictable zero monthly fuel cost.
The maths in Lagos: A household spending ₦80,000/month on generator fuel and NEPA bills could install a suitable solar system for ₦2.5–₦4 million and recover that cost in 3.5–5 years. After that, power is essentially free for 20+ years.
The right system size depends on what you want to power and for how long. Below are typical specifications for homes in Ikeja and across Lagos, calculated for 4.9 peak sun hours per day.
| Home size | Panels needed | Inverter size | Battery storage | Typical cost (₦) |
|---|---|---|---|---|
| 1–2 bedroom flat | 4–6 panels (400W) | 2–3 kVA | 5–10 kWh lithium | ₦1.2M – ₦2.0M |
| 3–4 bedroom house | 6–12 panels (400W) | 3–5 kVA | 10–20 kWh lithium | ₦2.0M – ₦3.8M |
| 5+ bedroom / duplex | 12–20 panels (400W) | 5–10 kVA | 20–40 kWh lithium | ₦3.8M – ₦7.5M |
| Office / small business | 8–16 panels (400W) | 5–10 kVA | 15–30 kWh lithium | ₦2.5M – ₦6.0M |
Note on AC units: Air conditioners (1.5 HP) each add roughly 1,100W to your peak load and 8–10 kWh/day to your energy needs. In Lagos's climate, AC sizing is the single biggest factor in your system cost. Every AC unit adds approximately ₦600,000–₦900,000 to the total system cost.
We match residents across Lagos with verified solar installers who cover their area. Our network reaches all major cities and LGAs including Eti-Osa, Alimosho, Kosofe.
| City / Area | Sun hours | Avg system size | Lead time |
|---|---|---|---|
| Ikeja | 4.9 hrs/day | 3–7 kVA hybrid | 1–2 weeks |
| Lekki | 4.9 hrs/day | 3–5 kVA hybrid | 1–3 weeks |
| Badagry | 4.9 hrs/day | 3–5 kVA hybrid | 1–3 weeks |
| Epe | 4.9 hrs/day | 3–5 kVA hybrid | 1–3 weeks |
| Ikorodu | 4.9 hrs/day | 3–5 kVA hybrid | 1–3 weeks |
| Apapa | 4.9 hrs/day | 3–5 kVA hybrid | 1–3 weeks |
| Other Lagos LGAs | 4.9 hrs/day | 2–5 kVA off-grid | 2–4 weeks |
These are the inverter and battery brands most commonly installed by solar companies operating in Lagos and Ikeja. Installers choose them for local availability, after-sales support, and performance in Nigerian conditions.
1. Calculate your needs. Use our free solar calculator to enter your current generator spend, appliances, and location. You'll get a recommended system size and cost estimate for Ikeja or your specific area of Lagos.
2. Get matched with installers. We connect you with verified solar companies covering Lagos. They'll contact you on WhatsApp within 24 hours with a detailed quote based on your results.
3. Compare and choose. Receive quotes from multiple installers. Compare prices, warranties, equipment brands, and timelines. A good installer will conduct a site visit before finalising.
4. Installation. Most residential installations in Lagos take 1–3 days. Your installer handles wiring, mounting, inverter configuration, and commissioning. A reputable company provides a written warranty on both equipment and installation workmanship.
Enter your current power costs and appliances. Get a personalised system recommendation and free quotes from verified installers — in 2 minutes.
Lagos receives 4.9 peak sun hours daily — moderate for solar generation. For a typical 3-bedroom home in Ikeja, you'll need between 10–16 panels of 400W panels to cover your essential loads. A home with air conditioning will need the higher end. Use our calculator for a precise figure based on your specific appliances.
The most popular inverter brands used by installers in Lagos are Growatt, Felicity, Schneider. For residential use in Ikeja, Growatt and Felicity hybrids offer the best balance of price and reliability. For larger commercial setups, Victron and Schneider are widely preferred. Your installer will recommend the right size (kVA) based on your peak load.
A residential solar system in Lagos typically costs between ₦1.5 million and ₦6 million fully installed, depending on size. A 3 kVA hybrid system with 6 panels and 10 kWh lithium battery runs around ₦1.8–2.5 million. A 5 kVA system with 10 panels runs ₦2.5–4 million. Get a free personalised quote from our calculator.
Given Lagos's 4.9 peak sun hours daily and typical generator costs in Ikeja, most residential solar systems pay for themselves in 3.5–5 years. After that, your power is essentially free for the remaining 15–20 year lifespan of the panels. Homes running generators 8+ hours daily see the fastest payback.
Lagos receives less direct sunlight during the rainy season, but modern solar panels still generate 50–70% of their peak output on cloudy days. A properly sized battery bank and hybrid system ensures you still have reliable power even during extended overcast periods. Our installers size systems with seasonal variation in mind.
Find localised solar costs, system sizes, and installer networks for every Nigerian state.